Join the 21st Century School Buildings Program and RRMM-Lukmire Architects during Robert Coleman’s May Celebration for a presentation on the building design and floorplans. The presentation will be set up for the majority of the May Day celebration. Please stop by to review the plans, ask RRMM-Lukmire questions, and learn about plans to relocate Robert Coleman to its temporary location from the 21st Century Program. (RRMM-Lukmire will be available for questions from 10:00-11:00 am.)
The design of the building will occur over four phases: Concept Design, Schematic Design, Design Development, and Final Drawings.
All are welcome! Staff, parents, students, and community members are encouraged to attend.